Login
EuropaOwners Random Items Front fuse conduit run 2.
Advanced Search
View Slideshow (Fullscreen)

Random Images

IM003530

IM003530

Date: 11/06/2007 Views: 6822

Battery Box Attachment_10

Battery Box Attachment_10

Date: 04/11/2010 Views: 4685

IMG_2361

IMG_2361

Date: 08/07/2005 Views: 21270

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 769091

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 769091

Front fuse conduit run 2.

Template was fabricated so it will work for both the starboard and port side.
I just need remember to use opposite side of wood for second side.
Here we are bonding foam to starboard side with JB KWIK after we 3M 375 taped both the foam and wood. The woods tape got scuff sanded to make the JB stick to it and leave the foam molds backside nice and clean, (and flat).
I screwed up a little thinking this was the port side! No problem, we need a starboard side anyway, so might as well start here.
Y10-08-20

Date: 08/19/2010
Size:
Full size: 2592x1944
Front fuse conduit run 2.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/4.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Fri 20 Aug 2010 02:41:10 AM UTC
Powered by Gallery v2.3