Login
EuropaOwners Random Items Second and final pass of Port top wingskin bond on 4.
Advanced Search
View Slideshow (Fullscreen)

Random Images

N4211W wing rigging 9.

N4211W wing rigging 9.

Date: 10/09/2010 Views: 6191

Front Starboard fuse stiffening for lift socket 9.

Front Starboard fuse stiffening for lift socket 9.

Date: 10/24/2010 Views: 5710

dscn1099

dscn1099

Date: 12/31/1969 Views: 3958

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 726197

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 726197

Second and final pass of Port top wingskin bond on 4.

The forward portion of the root rib had a little void that we didn't get on first pass.
After wetting out surface, Alan filled with a Flox rich Redux mix. There was only a small number of areas other than this spot that needed the Flox rich mixture.
Everything got covered with a thinner mixture.
Y10-09-13

Date: 09/13/2010
Size:
Full size: 2592x1944
Second and final pass of Port top wingskin bond on 4.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/2.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Mon 13 Sep 2010 09:32:07 PM UTC
Powered by Gallery v2.3