Login
EuropaOwners Random Items JB KWIK aileron dam 3.
Advanced Search
View Slideshow (Fullscreen)

Random Images

Time to start taper sanding 3.

Time to start taper sanding 3.

Date: 11/01/2009 Views: 5050

P9010079

P9010079

Date: 09/01/2007 Views: 9600

GJ7I2448

GJ7I2448

Date: 07/09/2006 Views: 4191

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 771524

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 771524

JB KWIK aileron dam 3.

Aileron and trail edge of the bottom of port wing filled with Aeropoxy-Light.
The technique of heating knife and fill with hot air gun works great, it allows you to work with mix a lot longer.
We will allow cure overnight.
After cure and a light sanding, will follow up with a few passes of 3M Flowable Finishing putty.
Y10-09-29

Date: 09/27/2010
Size:
Full size: 2592x1944
JB KWIK aileron dam 3.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/4.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Tue 28 Sep 2010 02:21:45 AM UTC
Powered by Gallery v2.3