Login
EuropaOwners Random Items Aft fuse conduit run 19.
Advanced Search
View Slideshow (Fullscreen)

Random Images

GPTAG_Finland

GPTAG_Finland

Date: 12/31/1969 Views: 3683

IMG_0769

IMG_0769

Date: 01/04/2006 Views: 5701

S3

S3

Date: 10/31/2008 Views: 5423

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693422

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693422

Aft fuse conduit run 19.

This aft conduit was trimmed to proper length, scuff sanded, wet out with Redux. Redux/Flox applied. Then it was screwed in place.
Tape was left in place when conduit was being screwed, squeeze out was cleaned up and tape was removed.
Scuff sanding goes beyond conduit contact area in preparation for fill. Baggage bay bulkhead contact area was prepped prior to bonding on top fuse while it was easier to access. Now it will require only a light wake up sanding.
Y11-01-02
XS-FUN

Date: 01/02/2011
Size:
Full size: 2592x1944
Aft fuse conduit run 19.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/2.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Sun 02 Jan 2011 02:51:29 AM UTC
Powered by Gallery v2.3