Login
EuropaOwners Random Items Starboard and Port Bucket 3 of 4.
Advanced Search
View Slideshow (Fullscreen)

Random Images

Vertical upright, swing-arm and generator install 5 of 7.

Vertical upright, swing-arm and generator install 5 of 7.

Date: 08/12/2003 Views: 10221

ALFRED UPSTOP 2

ALFRED UPSTOP 2

Date: 02/16/2015 Views: 18221

DSCN5091

DSCN5091

Date: 12/14/2006 Views: 9802

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 771202

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 771202

Starboard and Port Bucket 3 of 4.

First thing is to position your 2 x 6 perpendicular to the handle (see Starboard and Port Bucket build 1 of 3.). In other words make sure the handle is directly above the end-grain of the 2 x 6.
Using 1" or 1+1/2" Sheetrock screws, put a washer under the head of each screw and attach the Bucket to the 2 x 6 (screws and washers are positioned inside of the Bucket going into the 2 x 6) with four screws. Locate the screws ~ 1" inboard from the walls of the Bucket, 3" from each other and centered on the 2 x 6.

Y11-09-13

Date: 08/06/2003
Size:
Full size: 4048x3040
Starboard and Port Bucket 3 of 4.

Photo Properties

summary  details
Make FUJIFILM Model FinePix S7000
Aperture Value f/4.4 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash No Flash Focal Length 15 mm
ISO 160 Metering Mode Multi-Segment
Shutter Speed Value 1/260 sec Date/Time Wed 06 Aug 2003 03:48:27 PM UTC
Powered by Gallery v2.3