Login
EuropaOwners Random Items Port Bucket 1 of 1.
Advanced Search
View Slideshow (Fullscreen)

Random Images

Battery Switch operation.

Battery Switch operation.

Date: 02/22/2010 Views: 5591

DSCN5112

DSCN5112

Date: 11/29/1999 Views: 5947

IMG_0244Ann

IMG_0244Ann

Date: 04/16/2008 Views: 5983

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 705691

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 705691

Port Bucket 1 of 1.

On the port Bucket since there is no derailer to deal with, position the 2 x 6 hard against the outboard face of the axle receptacle.
Then position the remaining two 1 x 2 x 5+3/4" with their inboard end-grain edges hard against the outboard face of the axle receptacle and their long edges hard against the axle extender.
Then drill clearance holes in the 1 x 2s for four Sheetrock screws (1+1/2" or 2") located 1" in from the end-grain edges of the 1 x 2s and screw the 1 x2s into the 2 x 6..

Y11-09-13

Date: 08/06/2003
Size:
Full size: 4048x3040
Port Bucket 1 of 1.

Photo Properties

summary  details
Make FUJIFILM Model FinePix S7000
Aperture Value f/4 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash No Flash Focal Length 20 mm
ISO 200 Metering Mode Multi-Segment
Shutter Speed Value 1/240 sec Date/Time Wed 06 Aug 2003 03:54:20 PM UTC
Powered by Gallery v2.3