|
IMG_0500
Date: 10/12/2008
Views: 3963
|
|
|
Spar ramp 9.
Date: 12/07/2010
Views: 3415
|
|
|
CH8_13
Date: 12/31/1969
Views: 4008
|
|
|
IMG_1280ann
Poly has been taped over the front half. This will prevent the interior layup from sticking to the front half forming the joining flange. The front and rear have been taped together in preparation for the inner layup.
Date: 03/29/2011
Views: 2646
|
|
|
DSCN6457
Date: 10/25/2009
Views: 2178
|
|
|
L1010195
Date: 03/17/2008
Views: 3917
|
|
|
Mid panel insert 12.
Date: 11/17/2010
Views: 3443
|
|
|
dsc09034
Starboard side done. Pic taken before a little clean up.
Date: 01/22/2013
Views: 6593
|
|
|
060202_Panel1
Date: 12/31/1969
Views: 2869
|
|
|
IMG_6425Ann
Date: 12/22/2007
Views: 3257
|
|
|
nex_2014_01_25_28
Wings on. Not really required at the stage. Just had to do it for motivation.
Date: 01/26/2014
Views: 6337
|
|
|
DSCN8308
Date: 09/18/2010
Views: 2706
|
|
|
Control_Systems_17
Date: 01/23/2006
Views: 2474
|
|
|
Door sill conduit run 20.
Date: 08/12/2010
Views: 3058
|
|
|
Bild_024
Date: 10/31/2008
Views: 2993
|
|
|
IMG_0822ann
Set to drilling and bolting the new outer brackets in place.
Date: 01/27/2011
Views: 2791
|
|
|
IMG_0005
Date: 05/06/2007
Views: 4799
|
|
|
Aft_door_hinges_1_Y9_06_07
Date: 06/07/2009
Views: 4155
|
|
|
DSCN4730Ann
Date: 09/18/2006
Views: 3069
|
|
|
DSCN6358
Date: 10/11/2009
Views: 2520
|
|