|
Bild_015_1
Date: 08/22/2008
Views: 3031
|
|
|
Rigging descision 2.5 Starboard, 2.4 Port and droop port flap .110 at root 1.
Date: 10/25/2010
Views: 2513
|
|
|
dsc08634
OK now that the plane is off the trailer and on its own wheel we were able to remove most of the trailer hardware and position the ribs. We also used the main bolts to hold the first rib in place. The other rib was left a little lower to be located once
Date: 04/15/2012
Views: 6468
|
|
|
Rivets
Next problem. Once the push rod end was fitted and drilled according to the manual the rivets provided were too short to go through the whole structure. Awaiting a response from Europa
Date: 09/03/2015
Views: 7578
|
|
|
CH9P_6
Date: 12/31/1969
Views: 3850
|
|
|
DSCN6193
Date: 10/11/2009
Views: 2410
|
|
|
IMG_7670Ann
Date: 04/27/2008
Views: 2857
|
|
|
AftTrimPrep00Ann
Date: 05/18/2004
Views: 2290
|
|
|
Battery11Ann
Date: 04/29/2005
Views: 3243
|
|
|
Ferg wiring 2
Date: 04/11/2010
Views: 2720
|
|
|
P1210026
Date: 01/21/2006
Views: 4839
|
|
|
Access_Panel_2
Date: 06/03/2005
Views: 6076
|
|
|
Lower door anti-bulge 12.
Date: 12/01/2009
Views: 2824
|
|
|
DSCN3955
Date: 09/30/2005
Views: 2682
|
|
|
DSC_0109_s
Date: 11/18/2007
Views: 2715
|
|
|
monteq3
Date: 08/14/2011
Views: 1282
|
|
|
Solar 2
Date: 04/14/2011
Views: 2603
|
|
|
Landing_Gear_2
Date: 01/28/2006
Views: 2395
|
|
|
ThrottleHousingII10
Date: 03/02/2004
Views: 2998
|
|
|
DSCN6363
Date: 10/11/2009
Views: 2380
|
|