|
LGSpace05
Date: 02/18/2004
Views: 2816
|
|
|
first_flight_2
Date: 07/19/2007
Views: 2509
|
|
|
dscn0977
Date: 12/31/1999
Views: 2446
|
|
|
DSCN6612
Date: 10/25/2009
Views: 2195
|
|
|
dsc08965
Port side after layups and peel ply removed. Notice shape of hole for the angle of the LG socket. I wrapped the LG socket with sandpaper and used it to form the hole.
Date: 10/01/2012
Views: 8648
|
|
|
122_2227_IMG
Date: 01/26/2005
Views: 4200
|
|
|
Aft door handle 4.
Date: 01/03/2010
Views: 2522
|
|
|
CH17MOD_4
Date: 12/31/1969
Views: 3071
|
|
|
MG_1704
Date: 07/09/2006
Views: 2625
|
|
|
GJ7I2491
Date: 07/09/2006
Views: 3723
|
|
|
IMG_0054
Date: 03/03/2007
Views: 3847
|
|
|
Completion of Port top skin bond on 68.
Date: 09/23/2010
Views: 2279
|
|
|
DSC_0130
Date: 09/21/2007
Views: 2590
|
|
|
Second and final pass of Port top wingskin bond on 5.
Date: 09/13/2010
Views: 2925
|
|
|
IMG_2688
Cut away excess material on the sides of the angle. Will probably cut away more excess material from the base part of the angle.
Date: 04/09/2012
Views: 3082
|
|
|
Rivets
Next problem. Once the push rod end was fitted and drilled according to the manual the rivets provided were too short to go through the whole structure. Awaiting a response from Europa
Date: 09/03/2015
Views: 7532
|
|
|
DSCN4542Ann
Date: 06/24/2006
Views: 2410
|
|
|
DSCN8311
Date: 09/18/2010
Views: 3246
|
|
|
Jamar cutting.jpg
Date: 03/21/2010
Views: 2648
|
|
|
PortWingAccess3
Date: 03/22/2004
Views: 2565
|
|