|
DSCN8306
Date: 09/18/2010
Views: 2969
|
|
|
Troy 2.
Date: 02/24/2010
Views: 3158
|
|
|
Front fuse conduit run 14.
Date: 09/08/2010
Views: 4432
|
|
|
Stick grip 6
Date: 03/22/2009
Views: 3296
|
|
|
DSCN6667
Date: 10/25/2009
Views: 2254
|
|
|
Starboard wing 31.
Date: 06/16/2009
Views: 2838
|
|
|
DSC_0291
Date: 05/15/2008
Views: 3259
|
|
|
Jewel-Pee 2.
Date: 12/31/1970
Views: 5048
|
|
|
CH28_08
Date: 07/04/2006
Views: 2956
|
|
|
Battery Box Attachment_6
Date: 04/11/2010
Views: 2138
|
|
|
032602_doorhinge6
Date: 12/31/1969
Views: 2150
|
|
|
Bild_007_1
Date: 08/22/2008
Views: 3467
|
|
|
Waiting_for_fuel_San_Sebastian_LESO_Spain
Date: 06/27/2009
Views: 3006
|
|
|
Composite rivets 1.
Date: 08/29/2009
Views: 2696
|
|
|
dscn2736
Date: 12/31/1969
Views: 2078
|
|
|
IMG_1144
Date: 03/24/2004
Views: 3040
|
|
|
16_fill_complete_rear_view
Date: 10/29/2007
Views: 2728
|
|
|
IMG_5632
Date: 11/17/2013
Views: 18756
|
|
|
Aluminum Plenum flanges installed
Aluminum flanges were added to the plenums so that the plenums would not need to be fastened directly to the hot heads. Later in the build, the pop rivets were replaced with machine screws so that the front 2/3 of the plenum could be easily removed
Date: 01/01/2011
Views: 12072
|
|
|
MDO_Aircraft_P1
Date: 10/18/2009
Views: 5408
|
|