|
A062403_Two_6
Date: 12/31/1969
Views: 3604
|
|
|
021802_sand_bags
Date: 12/31/1969
Views: 2601
|
|
|
Inbound_to_Barkaby_ESKB_1
Date: 12/31/1969
Views: 3007
|
|
|
IMG_9571post
The fuel lines were tied with tie-wraps and 1/2" (12.7 mm) rubber fuel hose lengths. The vent hose was tied in as well by running it through short lengths of fuel hose and using tie-wraps to hold the rubber hose and protect the vent line from chafin
Date: 06/12/2010
Views: 3741
|
|
|
DSCN6082
Date: 10/11/2009
Views: 3025
|
|
|
IM001870
Date: 10/29/2007
Views: 4059
|
|
|
Jeff_2
Date: 07/25/2009
Views: 3532
|
|
|
oilcooler3
Date: 06/13/2010
Views: 2725
|
|
|
Wing fillet Fred 1
Date: 11/23/2010
Views: 1694
|
|
|
Ivan_ja_Jos_5
Date: 07/19/2007
Views: 2567
|
|
|
IMG_3388
Date: 10/24/2010
Views: 3195
|
|
|
Door hinge rebates 55.
Date: 11/12/2009
Views: 2359
|
|
|
IMG_4625
Date: 05/18/2012
Views: 8958
|
|
|
DSC_0320
Date: 09/21/2007
Views: 5860
|
|
|
FuselageInCradle04Ann
Date: 07/11/2004
Views: 2085
|
|
|
IMG_0975Ann
Date: 08/06/2007
Views: 3815
|
|
|
Filled glassed over hole on port door.
Date: 09/03/2009
Views: 2783
|
|
|
IMG_0126
Date: 12/02/2006
Views: 3011
|
|
|
DSCN5243Ann
Date: 12/17/2006
Views: 2628
|
|
|
DSCN5794Ann
Date: 04/25/2007
Views: 4493
|
|