|
IM003507
Date: 11/01/2007
Views: 5147
|
|
|
InstrumentPanel87Ann
Date: 10/09/2005
Views: 2620
|
|
|
N4211W wing rigging 21.
Date: 10/09/2010
Views: 2605
|
|
|
110_1006_IMG
Date: 02/11/2004
Views: 3366
|
|
|
Top fuse repair 1.
Date: 07/15/2009
Views: 2314
|
|
|
custom engine installation
Date: 09/13/2014
Views: 5715
|
|
|
cliff3
Date: 12/31/1969
Views: 5770
|
|
|
Melted metal together (TIG), then Self Etch Primer
Date: 11/28/2013
Views: 3084
|
|
|
DSC_0136
Date: 06/24/2007
Views: 2838
|
|
|
DSC01706
Date: 12/31/1969
Views: 4997
|
|
|
2005_DSCF0055_15_1
Date: 02/04/2009
Views: 2656
|
|
|
DSCN5604Ann
Date: 03/11/2007
Views: 2605
|
|
|
110_1041_IMG
Date: 03/02/2004
Views: 6678
|
|
|
IM002935
Date: 10/30/2007
Views: 3441
|
|
|
2006SnF009
Date: 04/07/2006
Views: 3156
|
|
|
IMG_0458ann
I've gone back to the build manual and made up a pair of reinforcements. Here marking where the upholstery will be cut to make a place for them.
Date: 10/20/2010
Views: 2616
|
|
|
Landing_Gear_49
Date: 01/23/2006
Views: 2537
|
|
|
DSC00283
Date: 12/31/1969
Views: 3002
|
|
|
img0822copy
Date: 07/29/2007
Views: 1963
|
|
|
IMG_9571post
The fuel lines were tied with tie-wraps and 1/2" (12.7 mm) rubber fuel hose lengths. The vent hose was tied in as well by running it through short lengths of fuel hose and using tie-wraps to hold the rubber hose and protect the vent line from chafin
Date: 06/12/2010
Views: 3731
|
|