|
Mass_Balance_Tower_04
Date: 01/23/2006
Views: 3064
|
|
|
GJ7I2161
Date: 07/04/2006
Views: 2767
|
|
|
DSCF0032
Date: 02/14/2009
Views: 2602
|
|
|
DSCN6688
Date: 10/25/2009
Views: 2458
|
|
|
IMG_1456
Date: 02/07/2010
Views: 3831
|
|
|
DSC00157
Instructions state that rod should be reamed to 0.375" but it needed to be reamed out 0.428" to fit push rod.
Date: 09/03/2015
Views: 7825
|
|
|
DSC_0205
Date: 03/04/2016
Views: 4773
|
|
|
Bonding Port lift pin sockets 11.
Date: 10/28/2010
Views: 3358
|
|
|
DSCN5287
Date: 06/26/2009
Views: 2979
|
|
|
2006SnF037
Date: 04/07/2006
Views: 2783
|
|
|
dscn0411
Date: 12/31/1969
Views: 2858
|
|
|
Flowscan wire run 4.
Date: 08/04/2010
Views: 2676
|
|
|
Plexiglass and exterior cleaning Bud.
Date: 03/10/2011
Views: 1747
|
|
|
DSCN3654
Date: 07/01/2005
Views: 2576
|
|
|
Second and final pass view from the inside 1.
Date: 09/13/2010
Views: 2326
|
|
|
IMG_2524
Maybe by the end of the week I can have the shell installed and wired into the aircraft so I can plug these into it. We'll see. These 26ºF (-3.3ºC) mornings have been limiting me to only 4 or 5 hours of afternoon work a day.
Date: 01/03/2012
Views: 3254
|
|
|
IMG_2408
Date: 09/21/2005
Views: 2957
|
|
|
XS_tri_firewall
Date: 06/24/2003
Views: 4567
|
|
|
081402_lowerflap_fairing2
Date: 12/31/1969
Views: 2525
|
|
|
IMG_0310Ann
Date: 05/18/2008
Views: 2920
|
|