|
nex_2014_01_25_03
Port side dirty work. Just test fitting final install with all hardware will be after the legs are painted.
Date: 01/25/2014
Views: 6397
|
|
|
IMG_0321
Date: 04/17/2005
Views: 2439
|
|
|
DoorLatch43
Date: 05/10/2004
Views: 2712
|
|
|
dscn0815
Date: 12/31/1969
Views: 2433
|
|
|
IMG_9150post
Date: 08/10/2009
Views: 2810
|
|
|
GJ7I2494
Date: 07/09/2006
Views: 4390
|
|
|
Port headrest conduit 4.
Date: 08/21/2010
Views: 3323
|
|
|
Mollis_AB_Switzerland_2003
Date: 12/31/1969
Views: 2303
|
|
|
Web_Site_10
Date: 03/25/2004
Views: 4182
|
|
|
InstrumentPanel101
Date: 12/25/2005
Views: 3045
|
|
|
A022603pained2
Date: 12/31/1969
Views: 2818
|
|
|
MG_1712
Date: 07/09/2006
Views: 3221
|
|
|
2005oct08_09_001
Date: 11/09/2005
Views: 3284
|
|
|
IMG_2387
Date: 08/14/2005
Views: 3434
|
|
|
New MC-4A 12
The whole assembly should now fit, length and width, within the existing space. So the unit may be dropped down as needed to allow for it being taller. Due to outside commitments, it looks like it will be Wednesday (18th) before I can get to the hanger
Date: 04/15/2012
Views: 2708
|
|
|
Port aft hinge mounted as well.
Date: 10/15/2009
Views: 2947
|
|
|
DSCN6597
Date: 10/25/2009
Views: 2190
|
|
|
IM003674
Date: 11/28/2007
Views: 3311
|
|
|
Wing root fairing instructions for fitting Fred 12
Date: 02/21/2009
Views: 2845
|
|
|
110_1038_IMG_001
Date: 03/02/2004
Views: 4863
|
|