|
139_3909
Date: 12/31/1969
Views: 3721
|
|
|
DSC00286
Date: 12/31/1969
Views: 3652
|
|
|
Aft fuse conduit run 14.
Date: 08/20/2010
Views: 2686
|
|
|
Aft sill cover 13.
Date: 09/02/2010
Views: 2425
|
|
|
smDSCN1965
Date: 12/31/1969
Views: 3517
|
|
|
dscn1802
Date: 12/31/1969
Views: 2497
|
|
|
Cobra_head_front
Front view of cobra head modification. A vane was added to help smooth flow of air into the carb. The vane runs the length of the cobra head and extends about 1 inch into the carburetor throat. It seems to have helped even out the CHTs and EGSs between
Date: 11/05/2011
Views: 11335
|
|
|
IMG_0101
Date: 12/19/2006
Views: 2356
|
|
|
Second and final pass view from the inside 6.
Date: 09/13/2010
Views: 2424
|
|
|
IMG_3060
Date: 12/31/2010
Views: 4088
|
|
|
MODWingStrobePort7
Date: 06/26/2005
Views: 3464
|
|
|
A050703WEC
Date: 12/31/1969
Views: 2545
|
|
|
6_Dam_balsa_removed
Date: 10/29/2007
Views: 3069
|
|
|
DSC_0239
Date: 05/15/2008
Views: 2930
|
|
|
123102_wings_3
Date: 12/31/1969
Views: 2717
|
|
|
Fuse post bond 13.
Date: 05/02/2009
Views: 2921
|
|
|
IMG_1175
Date: 09/30/2009
Views: 4487
|
|
|
16022003135301_G
Date: 12/31/1969
Views: 2281
|
|
|
IMG_0155Ann
Date: 07/17/2007
Views: 3082
|
|
|
IMG_7235
A strip being bonded to the front wall.
Date: 01/31/2014
Views: 4270
|
|