Date: 10/27/2009 Views: 3083
Date: 11/29/1999 Views: 3135
Date: 12/31/1969 Views: 5138
Date: 08/23/2023 Views: 87907
Date: 05/23/2007 Views: 533433
The hinge areas were scuff sanded in preparation for the layups. A small batch of expoxy was mixed with FLOX. This was applied to the area of the upper hinge where a flange area has been ground flat.