Date: 10/31/2007 Views: 4823
Date: 10/25/2009 Views: 2492
Date: 08/09/2009 Views: 2788
Date: 08/23/2023 Views: 85668
Date: 05/23/2007 Views: 532709
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.