Better shot of Airbrake reed switch anchor on main gear lever Tufnal.
Now need to get wires up through tunnel. Going to use 1/4" OD snap bushings, problem is they are too short.
You can see completed snap bushing installed here, just forward of Tufnal block. Details of how to make a long snap bushing follows.
Y10-06-13