Date: 12/13/2004 Views: 3267
Date: 10/29/2005 Views: 3104
Date: 03/12/2012 Views: 6074
Date: 08/23/2023 Views: 102890
Date: 05/23/2007 Views: 536820
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.