1/2" ball end-mill on order (McMaster) to to mill a pocket in the brake master cylinder directly above the mounting holes
Date: 12/13/2013
Views: 3798
IMG_0148Ann
Date: 12/24/2008
Views: 3467
Wing_Dolly_08
Date: 01/28/2006
Views: 3197
Newest Image
EAA SITE
Date: 08/23/2023
Views: 94316
Most Viewed Image
Wing fillet fairing
Date: 05/23/2007
Views: 535096
Starboard and Port Bucket 3 of 4.
First thing is to position your 2 x 6 perpendicular to the handle (see Starboard and Port Bucket build 1 of 3.). In other words make sure the handle is directly above the end-grain of the 2 x 6.
Using 1" or 1+1/2" Sheetrock screws, put a washer under the head of each screw and attach the Bucket to the 2 x 6 (screws and washers are positioned inside of the Bucket going into the 2 x 6) with four screws. Locate the screws ~ 1" inboard from the walls of the Bucket, 3" from each other and centered on the 2 x 6.