|
BID in place and plenty stiff.
Date: 01/21/2010
Views: 3093
|
|
|
Mounting brackets.
Date: 01/20/2010
Views: 3536
|
|
|
Antenna holder/module strengthening tube.
Date: 01/18/2010
Views: 2912
|
|
|
Antenna holder/module strengthening tube 2.
Date: 01/18/2010
Views: 3494
|
|
|
Tube shaped and held in place with JB KWIK Weld.
Date: 01/20/2010
Views: 3155
|
|
|
Rib to tie together.
Date: 01/20/2010
Views: 2879
|
|
|
Ready for 2 BID back, 1 BID front.
Date: 01/20/2010
Views: 2646
|
|
|
Needed to work with a mirror for joint layups.
Date: 01/20/2010
Views: 3273
|
|
|
Rib stuck in place.
Date: 01/18/2010
Views: 2725
|
|
|
Panel mounted after upper right side was buttered with Flox/Q-Cel.
Date: 01/15/2010
Views: 3302
|
|
|
Nice fit.
Date: 01/17/2010
Views: 3226
|
|
|
Warp down to 3/8" from 3/4".
Date: 01/17/2010
Views: 4912
|
|
|
Nice fit 2.
Date: 01/17/2010
Views: 2932
|
|
|
Gear lever hardware too close to module 2.
Date: 01/17/2010
Views: 5205
|
|
|
Gear lever hardware too close to module.
Date: 01/17/2010
Views: 2811
|
|
|
Contact area for hardware made flat.
Date: 01/17/2010
Views: 3226
|
|
|
1/8" plywood.
Date: 01/18/2010
Views: 2732
|
|
|
Time to mount instrument module.
Date: 01/11/2010
Views: 2890
|
|
|
Some warp out but voids rear themselves.
Date: 01/11/2010
Views: 3595
|
|
|
Lead to hold flat after heating.
Date: 01/11/2010
Views: 3189
|
|