Date: 03/12/2005 Views: 2806
Date: 06/20/2009 Views: 2391
Date: 08/11/2010 Views: 2814
Date: 08/23/2023 Views: 86551
Date: 05/23/2007 Views: 533020
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.