Date: 04/04/2005 Views: 3500
Date: 05/15/2008 Views: 3091
Date: 07/29/2007 Views: 4747
Date: 08/23/2023 Views: 113699
Date: 05/23/2007 Views: 540943
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.