Before closing E-bus switch, open Alternator switch first.
Date: 03/01/2011
Views: 1909
DSC02141
Date: 12/14/2009
Views: 5605
DSCF0017_004
Date: 10/26/2009
Views: 3009
Newest Image
EAA SITE
Date: 08/23/2023
Views: 170727
Front HardPoint 1
Before removing glass and foam from the outboard side of the tunnel, Art bonded some 1.5" aluminium drill bushings in place with JB KWIK to 3M 375 packaging tape that was scuff sanded.
Ended up the tape was not quite as stuck to the tunnel as I would have liked, so put some dabs of JB on top and bottom of the drill bushings directly to the paint.