Before removing glass and foam from the outboard side of the tunnel, Art bonded some 1.5" aluminium drill bushings in place with JB KWIK to 3M 375 packaging tape that was scuff sanded.
Ended up the tape was not quite as stuck to the tunnel as I would have liked, so put some dabs of JB on top and bottom of the drill bushings directly to the paint.