|
|
1/2" ball end-mill on order (McMaster) to to mill a pocket in the brake master cylinder directly above the mounting holes
Date: 12/13/2013
Views: 8431
|
|
|
Front threaded rod cut down to .450 (I aim for minimum of 9.5 threads of engagement on any 5/16-24 joint)
Date: 12/13/2013
Views: 7570
|
|
|
Rod end clevis fork ground down to 1.975" (again minimum 9.5 threads of engagement)
Date: 12/13/2013
Views: 8984
|
|
|
Length of coupler is ~ .855" cut down from 1". 9.5 times two is 19, so this allows minimum of 19 threads of engagement
Date: 12/13/2013
Views: 6554
|
|
|
Temporary mount using 1 flat head 1/4-28
Date: 12/13/2013
Views: 7471
|
|
|
Emergency Maneuver that starts with Heim? 1 of 13
Date: 12/16/2013
Views: 8335
|
|
|
I failed a bearing on purpose
Date: 11/27/2013
Views: 14824
|
|
|
Emergency Maneuver that starts with Heim? 2 of 13
Date: 12/16/2013
Views: 9044
|
|
|
Emergency Maneuver that starts with Heim? 3 of 13
Date: 12/16/2013
Views: 7250
|
|
|
Emergency Maneuver that starts with Heim? 4 of 13
Date: 12/16/2013
Views: 8309
|