Pretty much the front is flight ready.
Pretty much the front bracket is flight ready.
The two nuts got weight reduction, they need paint and the aft one will be Reduxed in place.
The star washer is bored.
You slide in the Series 6 cable with the aft bracket attached going forward through the pitch tube tunnel and thread it through this front mounting bracket.
With the large nut and star washer dangling and the threaded portion only a few inches through the bracket, you install the clevis fork jam nut and clevis fork (EZ to work on it at this location) then push things forward and install the star washer and front mounting nut, then hook up the clevis fork.
The coupler and threaded rod will be Reduxed to the cable after the coupler gets paint.
The master cylinder needs to get "up close and personal" with a two flute 1/2" ball end mill (on order from McMaster) to make a cable pocket in it.
May do some weight reduction on the Master Cylinder as well?
Y13-12-15
|
|