Mock up (really muck up) of new battery location 3.
Date: 07/24/2003
Views: 3799
Bonding of Starboard lift pin sockets 19.
Date: 10/20/2010
Views: 3139
Newest Image
EAA SITE
Date: 08/23/2023
Views: 155222
Second pass 1
Top of FL 18s taped with 3M 375 packaging tape and holes are filled with foam cord that will allow drilling to be a lot easier than if they were filled with Redux/Flox.
Y13-08-03