Date: 06/06/2003 Views: 3207
Date: 09/18/2010 Views: 3525
Date: 12/31/1969 Views: 2630
Date: 08/23/2023 Views: 159994
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.