Date: 11/29/1999 Views: 4041
Date: 12/31/1969 Views: 3010
Date: 03/16/2011 Views: 3704
Date: 08/23/2023 Views: 189566
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.