Date: 12/31/1969 Views: 4110
Date: 03/02/2009 Views: 2841
Date: 05/31/2008 Views: 3436
Date: 08/23/2023 Views: 207479
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.