Date: 07/05/2007 Views: 3173
Date: 04/15/2005 Views: 3056
Date: 10/19/2013 Views: 8226
Date: 08/23/2023 Views: 196084
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09