Date: 09/30/2005 Views: 3283
Date: 10/30/2007 Views: 4261
Date: 11/22/2005 Views: 3371
Date: 08/23/2023 Views: 191347
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09