Two forward and one aft 11/16 nuts get weight reduction
Date: 12/16/2013
Views: 3742
IMG_6696Ann
Date: 02/15/2008
Views: 3258
FuelSelectorAccessPlate08
Date: 10/21/2003
Views: 3761
Newest Image
EAA SITE
Date: 08/23/2023
Views: 119057
Fuze_fill_3
No pic of 2 BID layup, but first layer was 1+1/4" x 3" and second layer 1" x 2" then it was peel plied. Aeropoxy with 30 minute hardener was used and allowed overnight to cure.
Here it was wet out with Aeropoxy with 60 minute hardener, allowed to tack up real good and very very dry Aeropoxy with 60 minute hardener/Expancel applied.
Y9-05-21