Date: 02/13/2006 Views: 3659
Date: 12/31/1969 Views: 2958
Date: 10/30/2009 Views: 3048
Date: 08/23/2023 Views: 155009
Port side bonded in place after tapping aluminium ring, and inserting cut down, scuff sanded and wet out with Redux 4-40 100 degree flat head screws. Screw heads and edge of aluminium ring packed with Redux/flox.