Date: 06/12/2004 Views: 2423
Date: 03/17/2008 Views: 3040
Date: 12/31/1969 Views: 2593
Date: 08/23/2023 Views: 158474
Port side bonded in place after tapping aluminium ring, and inserting cut down, scuff sanded and wet out with Redux 4-40 100 degree flat head screws. Screw heads and edge of aluminium ring packed with Redux/flox.