Vertical upright, swing-arm and generator install 3 of 7.
Date: 08/12/2003
Views: 9003
DSC_0058
Date: 08/31/2007
Views: 4688
Newest Image
EAA SITE
Date: 08/23/2023
Views: 704575
Ultimate ventilator installation and associated repair 12.
Completed 2 BID reinforcement aft of Ultimate ventilator on port side to just about front of headrest after injecting a few voids with a bit of Redux/flox. Gave worst area about 12" aft of Ultimate ventilator another 2 BID, so the worst area has 4 BID above front lift pin. Ultimate ventilator area has a 4 BID reinforcement ring about 6.500" in diameter.
Y9-07-13