Login
EuropaOwners A-265 - (XS-FUN) - N4211W / Wayne Gutschow+Ron Parigoris Electric shop DeluxeDeductsDeBucks! Fuselage wire conduits, runs and finishing. Aft sill covers. Aft sill cover 9.
Advanced Search
View Slideshow (Fullscreen)

Aft sill covers.

1. Aft sill... ... 6. Aft sill... 7. Aft sill... 8. Aft sill... 9. Aft sill... 10. Aft sill... 11. Aft sill... 12. Aft sill... ... 38. Aft sill...

Random Images

Ultimate ventilator installation and associated repair 8.

Ultimate ventilator installation and associated repair 8.

Date: 07/10/2009 Views: 5643

Tie-bar 36.

Tie-bar 36.

Date: 11/16/2010 Views: 6076

IMG_1389

IMG_1389

Date: 02/05/2010 Views: 8976

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 695768

Aft sill cover 9.

3 BID starboard with Aeropoxy / 60 minute.
BID was applied 1 ply first, then 2 plies. Plastic was used to wet out and apply BID. 2 plies are 1/4" shorter than the first on the wood.
There is no tape on wood because this 3 BID layup is an extension and we wanted it to bond. It will also get 1 BID on the inside surface.
Y10-08-31

Date: 08/31/2010
Size:
Full size: 1425x1900
nextlast
first previous
Aft sill cover 9.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/2.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Tue 31 Aug 2010 09:48:10 PM UTC
nextlast
first previous
Powered by Gallery v2.3