Ultimate ventilator installation and associated repair 8.
Date: 07/10/2009
Views: 5643
Tie-bar 36.
Date: 11/16/2010
Views: 6076
IMG_1389
Date: 02/05/2010
Views: 8976
Newest Image
EAA SITE
Date: 08/23/2023
Views: 695768
Aft sill cover 9.
3 BID starboard with Aeropoxy / 60 minute.
BID was applied 1 ply first, then 2 plies. Plastic was used to wet out and apply BID. 2 plies are 1/4" shorter than the first on the wood.
There is no tape on wood because this 3 BID layup is an extension and we wanted it to bond. It will also get 1 BID on the inside surface.
Y10-08-31