Kingsley 4 Undercarriage latched up viewed from below.
Date: 09/04/2005
Views: 9423
Brackets are mounted. Wayne is about half way done with PCB.
Date: 07/15/2010
Views: 8073
DSCF0007_001
Date: 07/27/2009
Views: 5786
Newest Image
EAA SITE
Date: 08/23/2023
Views: 804347
Upright reinforced joints 2 of 2.
2) Apply glue to the contact areas of these two 2 x 3 reinforcements.
4) Using four 3" Sheetrock screws each for each upright joint reinforcement drill 4 clearance holes. Two each side of the vertical uprights and two in each of the reinforcement 2 x 3s. Then drill pilot holes for the screws. It's best if you do only one at a time. Drill only one clearance and one pilot hole at a time, then install and tighten that screw, then go onto the next.
This exercise will reward you with strong and stiff uprights.
Once the glue is dried or cured, you can back off the pivot screws to the point that gravity will move the swing-arm.