|
Needed to work with a mirror for joint layups.
Date: 01/20/2010
Views: 3694
|
|
Vertex handheld antenna being inserted in tube 1.
Date: 01/25/2010
Views: 3656
|
|
Vertex handheld antenna being inserted in tube 2.
Date: 01/25/2010
Views: 3674
|
|
Rib to tie together.
Date: 01/20/2010
Views: 3152
|
|
Ready for 2 BID back, 1 BID front.
Date: 01/20/2010
Views: 2950
|
|
Required spacing floxed in.
Date: 01/20/2010
Views: 3621
|
|
2 BID back.
Date: 01/21/2010
Views: 3180
|
|
1 BID front.
Date: 01/21/2010
Views: 2816
|
|
Port bottom strengthening.
Date: 01/20/2010
Views: 3229
|
|
BID in place and plenty stiff.
Date: 01/21/2010
Views: 3389
|