|
Needed to work with a mirror for joint layups.
Date: 01/20/2010
Views: 3646
|
|
Vertex handheld antenna being inserted in tube 1.
Date: 01/25/2010
Views: 3603
|
|
Vertex handheld antenna being inserted in tube 2.
Date: 01/25/2010
Views: 3636
|
|
Rib to tie together.
Date: 01/20/2010
Views: 3099
|
|
Ready for 2 BID back, 1 BID front.
Date: 01/20/2010
Views: 2916
|
|
Required spacing floxed in.
Date: 01/20/2010
Views: 3582
|
|
2 BID back.
Date: 01/21/2010
Views: 3146
|
|
1 BID front.
Date: 01/21/2010
Views: 2772
|
|
Port bottom strengthening.
Date: 01/20/2010
Views: 3166
|
|
BID in place and plenty stiff.
Date: 01/21/2010
Views: 3364
|