|
Needed to work with a mirror for joint layups.
Date: 01/20/2010
Views: 3257
|
|
Vertex handheld antenna being inserted in tube 1.
Date: 01/25/2010
Views: 3281
|
|
Vertex handheld antenna being inserted in tube 2.
Date: 01/25/2010
Views: 3352
|
|
Rib to tie together.
Date: 01/20/2010
Views: 2869
|
|
Ready for 2 BID back, 1 BID front.
Date: 01/20/2010
Views: 2637
|
|
Required spacing floxed in.
Date: 01/20/2010
Views: 3218
|
|
2 BID back.
Date: 01/21/2010
Views: 2857
|
|
1 BID front.
Date: 01/21/2010
Views: 2409
|
|
Port bottom strengthening.
Date: 01/20/2010
Views: 2820
|
|
BID in place and plenty stiff.
Date: 01/21/2010
Views: 3086
|