|
Needed to work with a mirror for joint layups.
Date: 01/20/2010
Views: 6624
|
|
Vertex handheld antenna being inserted in tube 1.
Date: 01/25/2010
Views: 6473
|
|
Vertex handheld antenna being inserted in tube 2.
Date: 01/25/2010
Views: 5787
|
|
Rib to tie together.
Date: 01/20/2010
Views: 5305
|
|
Ready for 2 BID back, 1 BID front.
Date: 01/20/2010
Views: 5131
|
|
Required spacing floxed in.
Date: 01/20/2010
Views: 6303
|
|
2 BID back.
Date: 01/21/2010
Views: 5691
|
|
1 BID front.
Date: 01/21/2010
Views: 5767
|
|
Port bottom strengthening.
Date: 01/20/2010
Views: 6452
|
|
BID in place and plenty stiff.
Date: 01/21/2010
Views: 5716
|