|
Needed to work with a mirror for joint layups.
Date: 01/20/2010
Views: 3268
|
|
Vertex handheld antenna being inserted in tube 1.
Date: 01/25/2010
Views: 3290
|
|
Vertex handheld antenna being inserted in tube 2.
Date: 01/25/2010
Views: 3362
|
|
Rib to tie together.
Date: 01/20/2010
Views: 2875
|
|
Ready for 2 BID back, 1 BID front.
Date: 01/20/2010
Views: 2644
|
|
Required spacing floxed in.
Date: 01/20/2010
Views: 3229
|
|
2 BID back.
Date: 01/21/2010
Views: 2860
|
|
1 BID front.
Date: 01/21/2010
Views: 2418
|
|
Port bottom strengthening.
Date: 01/20/2010
Views: 2827
|
|
BID in place and plenty stiff.
Date: 01/21/2010
Views: 3093
|