Front Starboard fuse stiffening for lift socket 12.
Date: 10/25/2010
Views: 3858
PitotStatic08
Date: 02/23/2003
Views: 4721
DSCN5225
Date: 11/29/1999
Views: 3997
Newest Image
EAA SITE
Date: 08/23/2023
Views: 191924
Shelf_pin_2
D-cover carbon fiber tubes go through these fiberglass tubes (nice fit) to help support shelf in addition to the 4 screws that are holding the shelf flanges to the baggage bay.
To drop shelf down for aft access just need to remove D-cover, 4 screws then shelf folds out of the way.
Fiberglass tubes are JB KWIKed to balsa, then balsa JB KWIKed to shelf, then a little flox and 3 plys of thin model aeroplane cloth up and over.
Layout of wires figured out. Ready to trim shelf to size and bond in wire and cable holders.
Y9-04-06