Results of first pass of Port top wingskin bond on 2.
Date: 09/12/2010
Views: 3255
IMG_1753
Date: 07/18/2004
Views: 5226
Newest Image
EAA SITE
Date: 08/23/2023
Views: 206302
Panel_02
Various photos of building carbon fibre flanges onto the panel. The CF should allow for extra strength but with the number I'm putting on, that shouldn't be a problem.