IMG_7014
Next catch was where the filler needed to go into its' position. There was a piece blocking which had to be removed.
Date: 10/23/2013
Views: 6851
|
|
IMG_7015
Finally, the new tank is in place. More or less.
Date: 10/23/2013
Views: 5455
|
|
IMG_7230
It was determined that a 1/4 in (6.4 mm) thick piece of rigid urethane foam topped with cork was needed to support the front "ledge" of the tank so it wouldn't sag.
Date: 01/26/2014
Views: 6462
|
|
IMG_7232
Must have had the tank in/out two dozen times determining necessary clearances and supports.
Date: 01/26/2014
Views: 5408
|
|
IMG_7290
Bonded in the foam and cork support for the "ledge" at the front of the tank.
Date: 02/14/2014
Views: 5223
|
|
IMG_7305
Checked, double checked and again checked all the fits.
Date: 02/16/2014
Views: 5623
|
|
IMG_7312
With one final overall fit of the tank.
Date: 02/17/2014
Views: 7503
|