Login
EuropaOwners N914XL - Bob Borger, N.Texas, USA: 99.0 hrs - Subsequent Flights Album has been updated as of 2016 05 16. Fuel Tank Replacement 09 Put the top back on.
Advanced Search
Mount with WebDAV RSS Feed for this Album View Latest Updates View Popular Items View Random Items View Slideshow (Fullscreen)

Fuel Tank Replacement

1. 01 Looking ... ... 4. 04 The Leak 5. 05 Fitting ... 6. 06... 7. 07 Plumbing... 8. 08 Leak... 9. 09 Put the ... 10. 10 Sight...

Random Images

Aft sill cover 23.

Aft sill cover 23.

Date: 09/03/2010 Views: 5782

DSCN5015Ann

DSCN5015Ann

Date: 12/08/2006 Views: 5705

CBM - 15 - PITCH TORQUE TUBE

CBM - 15 - PITCH TORQUE TUBE

Date: 11/18/2013 Views: 3843

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693395

09 Put the top back on.

This effort actually started before the final installation of the fuel tank. Fiberglass & epoxy strips had to be made up and bonded to the inside of the unit. Everything (tank, top, strips, sight gage, etc.) had to be fitted and placed to make sure the top went back on properly. The door sill had to be repaired. Upholstery had to be repaired and replaced. And, of course, there had to be some excitement in the hanger unrelated to the work.

Date: 07/14/2014
Owner: rlborger
Size: 22 items
nextlast
IMG_7233

IMG_7233

2-ply fiberglass strips were made up to be bonded to the inside of the unit. These strips went on all 4 sides. Here the strip is being bonded to the aft wall.

Date: 01/26/2014
Views: 8557
IMG_7235

IMG_7235

A strip being bonded to the front wall.

Date: 01/31/2014
Views: 6896
IMG_7319

IMG_7319

A test fit of the top. Check of the front.

Date: 02/17/2014
Views: 6688
IMG_7321

IMG_7321

Checking the back.

Date: 02/17/2014
Views: 9074
IMG_7322

IMG_7322

Checking the back.

Date: 02/17/2014
Views: 8530
IMG_7324

IMG_7324

Checking the back. Looks like a good fit overall.

Date: 02/17/2014
Views: 8845
IMG_7365

IMG_7365

Getting the sight gage plumbing in place.

Date: 02/22/2014
Views: 8604
IMG_7366

IMG_7366

Applying the fiberglass/epoxy strips to the port side. Plastic wrap to prevent the epoxy from bonding to the tools used to hold the strip in place.

Date: 02/22/2014
Views: 8588
IMG_7367

IMG_7367

Applying the fiberglass/epoxy strips to the starboard side.

Date: 02/22/2014
Views: 7605
IMG_7393

IMG_7393

Shot bags (25 lbs each) to hold the top in place for the final bonding. 2 plies of fiberglass over a micro filler in the cut.

Date: 03/01/2014
Views: 7340
nextlast
Page: 1 2 3
Powered by Gallery v2.3