First ply being held flat, then a bit of heat added.
Date: 01/11/2010
Views: 6325
IMG_0248post
Date: 09/14/2010
Views: 4875
Newest Image
EAA SITE
Date: 08/23/2023
Views: 704556
IMG_0127post
When all is aligned and established, the LG legs are removed and the blocks and angles bonded to the floor and each other with Bondo. While the Bondo cures a batch of Araldite/FLOX is mixed.