39 Year Dyke Delta build and I thought we were slow!
Date: 07/27/2010
Views: 4811
Flap_Motor_Installation_09
Date: 11/27/2007
Views: 3531
Newest Image
EAA SITE
Date: 08/23/2023
Views: 161270
IMG_0160post
As the first, the plywood was fitted, slathered on the bonding edges with Araldite/FLOX and pressed in place. It was inspected for voids and they were filled as necessary. FLOX corner transitions prepared. More layups made, epoxy painted on all bonding areas and the layups applied. Peel ply was used to cover all laid up areas.